
New TopShim run:

version = topshim 2.4.0
date = 2024-12-02
time = 17:17:17.498
command = topshim  convcomp tuneaxyz

FINE SHIMMING

Parameters:

probe = Z116098_0395
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 2.6 Hz, Target= 0.7 Hz, After= 1.3 Hz
Iteration  2: FWHM Before= 1.3 Hz, Target= 0.6 Hz, After= 0.8 Hz
Iteration  3: FWHM Before= 0.8 Hz, Target= 0.5 Hz, After= 0.4 Hz
Iteration  4: FWHM Before= 0.4 Hz, Target= 0.5 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.758


Performing tune after shimming
tune lock level increase = 1.3

shim changes: 
Z	-65
Z2	-84
Z3	+68
Z4	-385
Z5	+160
X	+99
Y	+139

duration = 2 min 49 sec
completed successfully
finished Mon Dec  2 17:20:04 2024


========================================================================
